Purpose |
Test OSS note for increase in performance of the rescheduling program |
Requested By |
Daniel Brennan |
Spec Created By |
Surya Basa |
Spec Created Date |
04/22/2013 |
Spec QA by |
Surya Basa |
Objects |
/AFS/SDV03V02 |
Document Status |
Complete |
Test Scenario/Sequence of Steps |
Expected Results |
1. Run the program in the background with open selection and log the details |
All the SO's meeting the rescheduling criteria should be save |
2. Create 2000 SO's through LSMW with three materials and 5 sizes. |
2000 SO's should be created. |
3. Post stock for the materials and ARUN the SO's and run rescheduling in the background for the given plant 0116 |
Rescheduling should be carried out for the line items in the plant |
4. Apply OSS note 1591215 and run rescheduling in background for plant 0116 and compare performance in the previous step. |
The job should be executed resonably quicker than in the earlier instance. |
5. Create 2000 SO's again with plant 0116 and run rescheduling in background and measure performance for the number of records and time taken. |
The job should be executed in a shorter duration for a comparative number of records/sales orders. |
6. Run rescheduling in the background with open selection and measure the performance. |
The job should be executed in a much shorter duration for a comaprative number of records than in the first step. |